North Texas Municipal Water District; South Mesquite Waste Water Treatment Plant

North Texas Municipal Water District; South Mesquite Wastewater Treatment Plant

      • Completion Date: 2014
      • Location: Mesquite TX
      • Texas Owner: North Texas Municipal Water District
      • Engineer: Perkins Consulting Engineers
      • Description: This project included construction of one packed bed chemical scrubber odor control facility with duct, one make up air unit with duct, two bulk chemical storage tanks, and associated civil, mechanical, electrical, instrumentation and controls work.
      Loading...